| 2020-2023 | JSC “OGK-2” | Reconnection of the 330 kV Kirishskaya GRES-Tikhvin-Liteiny power line to unit No. 10 of the 330 kV outdoor switchgear of Kirishskaya GRES |
Experience and knowledge are the energy of success
| 2020-2023 | JSC “OGK-2” | Reconnection of the 330 kV Kirishskaya GRES-Tikhvin-Liteiny power line to unit No. 10 of the 330 kV outdoor switchgear of Kirishskaya GRES |